Window Installation Chronicles: From Precision Work to Near Disasters Morning Arrival and Immediate Challenges
We finally made it to the job site this morning, only to find the crew already deep into installing windows. “Did anybody check if this one’s lined up?” I asked, half-joking but fully aware of how crucial proper alignment is. Jamie, ever the pragmatist, shot back, “I don’t want to hear it if it didn’t.”
The team dynamic shifted when we realized Jamie’s phone was out of commission. “Broke it in half last night,” he admitted, which meant no more avoiding hands-on work with phone calls. His to-do list—usually filled with calls—now became our shared responsibility.
GO DOWN TO THE PAGE TO WATCH THE VIDEO
The Window Alignment Puzzle(Window Installation Chronicles: From Precision Work to Near Disasters)

Our lower window was giving us trouble—it was as far into the opening as possible but still needed to go further. The flange was barely catching, creating a precarious situation. Jamie’s solution? Pre-drilling closer to the edge. “Why aren’t you using your finger?” someone quipped as he worked.
The tension peaked when we realized how close the glass was to the floor. “I hope this is tempered glass,” I muttered. A quick check confirmed it was—crisis averted. The transformation once the glass was in was striking. “Why does it look so much better with glass than just open?” Jason wondered aloud. It’s one of those small victories that make construction satisfying.
The Great Tape Debate
Jason decided to test Max’s knowledge instead of just explaining why we don’t tape the bottom of windows. “It gives water an escape route,” he finally revealed. The ideal method would involve pitching the window sill at 5°, but our confidence in flashing and caulking made us skip that step.
Meanwhile, Jamie casually held an entire steak in one hand while directing work—a surreal but not entirely unusual sight on our job sites.
Kitchen Cabinet Conundrum
With windows underway, we turned to the kitchen cabinets. Our plans lacked critical details—no sizes, no specifics. Jamie took charge, sketching the layout on a piece of foam. “From this, we can get the cabinets manufactured,” he explained.
GO DOWN TO THE PAGE TO WATCH THE VIDEO

Key considerations emerged:
– Finished Materials: Accounting for drywall and trim thickness to avoid misaligned sinks and drawers.
-Door Clearances: Ensuring drawers don’t collide with door trim—a lesson learned from past mistakes.
This kind of foresight separates functional kitchens from frustrating ones.
Heavy Lifting and Creative Solutions
Moving massive windows through the house was a logistical nightmare. Jonno proposed using a longboard for easier transport. “We don’t have any 16-year-olds on the crew,” I joked, but the idea had merit. Instead, we resorted to brute force, sliding a 300-pound window through tight spaces. “Almost didn’t make the turn!” Jason yelled as we navigated a corner.
Documenting minor imperfections in the windows became essential. “It’s just paint,” I reminded the team, but we needed to avoid blame for pre-existing damage.
The Scaffolding vs. Ladder Debate
Installing upper windows sparked a safety discussion. “We might not need scaffolding,” Jamie mused, eyeing two ladders and a suction cup holder. The “window in the basket” method—a term we coined on the spot—ended up working flawlessly, proving sometimes simplicity wins.
Tool Swapping and Hammer Philosophy
A spontaneous tool exchange highlighted crew camaraderie. Jamie handed Max a massive 22-ounce hammer, then offered Jonno a brand-new Stiletto. The deliberation was intense. “It’s like taking a wizard’s wand,” Jonno said, weighing the worn-in handle against the pristine new one. In the end, he took the new hammer, and Max inherited the beast.
Dump Trailer Dreams

A mid-day break featured our new Top Shelf dump trailer—a game-changer for hauling debris and equipment. Its telescopic piston and solar-powered battery were highlights. “This thing can lift 12,000 pounds,” I bragged, showing off the hydraulic jack and heavy-duty ramps. Sponsorships rarely feel this practical.
The Final Window Gauntlet
The last massive window—a tempered glass monster for the bathroom—required all hands on deck. “These are seriously heavy,” Jason groaned as we debated carrying it versus using the machine. We opted for a hybrid approach: slow, careful transport with the lift and manual guidance.
The “sucko holder” (our term for suction cup handles) proved invaluable. “Perkins Builder Sucko Holder—patent pending,” Jamie joked. The window slid into place with surprising ease, a relief after hours of anticipation.
Strength Tests and Knox’s Cameo
A grip strength tester appeared, sparking a crew competition. Max dominated at 153 pounds, but the real star was Knox, the site mascot, who bounded around oblivious to the chaos. “She works about as much as Jonno,” someone teased.
Reflections and Next Steps

By day’s end, we’d installed nearly all windows—only two remained. The bathroom’s giant glass panel loomed as tomorrow’s challenge, but for now, we celebrated progress. “That was a pretty amazing few days,” I admitted, though the memory of near-disasters (like almost dropping the heaviest window) lingered.
As Knox raced down the hill, nearly face-planting, it was a fitting metaphor for our week: chaotic, risky, but ultimately successful.